- Excavation of Trench
- Installation of Duct Bank at any elevation
- Installation of Duct Bank with or without reinforcing rebar
- Excavation safety procedures for protecting personnel and existing underground assets of your company
- Concrete installation
- Setting electrical manholes, handholds, electrical vaults and concrete slabs
- Install switch gear and transformer concrete pads and modified manholes and vaults
- Custom design for solving existing duct bank utility conflicts
- Directional Drilling pits
- Jack and Bore pits
- Installation and tie into any size manhole and vault
- Backfilling and Compaction